跳到主要內容區

中心主任-李政雄

姓    名

李政雄

職稱

教授

最高學歷

國立台灣科技大學管理研究所EDBA博士

中心職稱

主任

經歷

• 致理科技大學 國際貿易系 助理教授/副教授

• 台聚集團  資材規劃處  採購部

• 台灣玻璃工業(股)公司  董事長室  採購部

• 台灣新學友書局  編輯部

國際期刊學術論文發表

• Chen, Zhi-Ming, *Lee, Cheng-Hsiung, Lai, Hung-Lin (2022). Speedup the optimization of maximal closure of a node-weighted directed acyclic graph. Opsearch. (Accepted, EI)

• Chen, Zhi-Ming, *Lee, Cheng-Hsiung, Lin, Yu-Feng (2021, July). Minimize pruning cost of a node-weighted directed acyclic graph on applications of management. International Journal of Modelling, Identification and Control. (Accepted, EI)

*Lee, Cheng-Hsiung (2018, June). A dispatching rule and a random iterated greedy metaheuristic for identical parallel machine scheduling to minimize total tardiness. International Journal of Production Research, 56(6), 2292–2308. (SCI, 2017 Impact Factor: 2.623) MOST 104-2410-H-263-002-

*Lee, Cheng-Hsiung, Lai, Hung-Lin, and Roan, Jinshyang (2017, October). An optimal inventory model with partial backorders and diminishing demand rate. International Journal of Modelling, Identification and Control, 28(4), 326–335. (EI)

*Lee, Cheng-Hsiung (2017, August). A new discrete electromagnetism-like mechanism algorithm for identical parallel machine scheduling problem with eligibility constraints in metal nuts manufacturing. Arabian Journal for Science and Engineering, 42(8), 3609–3620. (SCI, 2017 Impact Factor: 1.092)

• Tseng, Chao-Tang, *Lee, Cheng-Hsiung, Chiu, Yuan-Shyi Peter, and Lu, Wei-Te (2017, April). A discrete electromagnetism-like mechanism for parallel machine scheduling under a grade of service provision. International Journal of Production Research, 55(11), 3149–3163. (SCI, 2016 Impact Factor: 2.325)

• Tseng, Chao-Tang, and *Lee, Cheng-Hsiung (2017, March). A new electromagnetism-like mechanism for identical parallel machine scheduling with family setup times. International Journal of Advanced Manufacturing Technology, 89(5), 1865–1874. (SCI, 2016 Impact Factor: 2.209)

• Liao, Ching-Jong, *Lee, Cheng-Hsiung, and Chen, Wan-Yin (2017, February). A hybrid tabu search algorithm for the variable periodic vehicle routing problem. Arabian Journal for Science and Engineering, 42(2), 513–535. (SCI, 2016 Impact Factor: 0.865)

• Liao, Ching-Jong, *Lee, Cheng-Hsiung, and Tsai, Hsing-Tzu (2016, July). Scheduling with multi-attribute set-up times on unrelated parallel machines. International Journal of Production Research, 54(16), 4839–4853. (SCI, 2015 Impact Factor: 1.693) NSC103-2410-H-263-001-

• Liao, Ching-Jong, *Lee, Cheng-Hsiung, and Lee, Hong-Chieh (2015). An efficient heuristic for a two-stage assembly scheduling problem with batch setup times to minimize makespan. Computers & Industrial Engineering, 88, 317–325. (SCI, 2015 Impact Factor: 1.783)

Lee, Cheng-Hsiung, *Liao, Ching-Jong, and Chao, Chien-Wen (2014). Unrelated parallel machine scheduling with dedicated machines and common deadline. Computers & Industrial Engineering, 74, 161–168.  (SCI, 2013 Impact Factor: 1.690)

Lee, Cheng-Hsiung, *Liao, Ching-Jong, and Chung, Tsui-Ping (2014). Scheduling with multi-attribute setup times on two identical parallel machines. International Journal of Production Economics,153, 130–138. (SCI, 2014 Impact Factor: 2.752)

Lee, Cheng-Hsiung, *Liao, Ching-Jong, and Chao, Chien-Wen (2012). Scheduling with multi-attribute setup times. Computers & Industrial Engineering, 63, 494–502. (SCI, 2012 Impact Factor: 1.516)

國內期刊論文

• 王珍一、林明宣、林郁芬、*李政雄,「採購策略與供應商關係對採購績效之影響:泰國台商製造業之研究」,致理學報,第39 (民國 10811)pp. 311–354

• *李政雄、何佳純、賴虹霖,「台灣傳統產業生產網絡轉移及跨國營運管理之個案分析以越南C公司為例」,致理學報,第38 (民國 10711)pp. 135–174

國際學術研討會

• Lee, Cheng-Hsiung, and *Tseng, Chao-Tang (2015). “Unrelated parallel machine scheduling with dedicated machine constraints for minimizing total tardiness.” The 2nd International Conference on Engineering and Natural Science, Jul. 22–24. Tokyo, Japan. (CD-ROM)

• Liao, Ching-Jong, *Lee, Cheng-Hsiung, Hsing-Tzu Tsai, and Wu, K. J. (2014). Scheduling with multi-attribute setup times on unrelated parallel machines, Proceedings of the 15th Asia Pacific Industrial Engineering and Management Systems Conference, Jeju, Korea. (CD-ROM)

• Lee, Cheng-Hsiung, *Liao, Ching-Jong, and Chung, Tsui-Ping (2012). Scheduling with multi-attribute setup times in polyvinyl chloride leather plant. Proceedings of the 13th Asia Pacific Industrial Engineering & Management Systems Conference, Phuket, Thailand. (CD-ROM)

• Lee, Cheng-Hsiung, *Roan, Jinshyang, and Lee, C. M. (2005). An optimal inventory model with partial backorders, Proceedings of the 34th Southwestern Decision Sciences Annual Meeting, Dallas, Texas, USA. (CD-ROM)NSC 92-2416-H-031-003

國內學術研討會

• 李政雄*阮金祥,「允許部份缺貨候補之最佳存貨模型」,管理大趨勢研討會論文集,台北,pp. 238–253200411月。

科技部專題研究計畫

• 李政雄,計畫主持人,行政院科技部專題研究計畫。計畫名稱加速最佳化於加權有向無環圖之最大封閉域及其在管理上的應用 (MOST 108-2410-H-263-008-),執行期限: 2019/08/01~2020/07/31

• 李政雄,計畫主持人,行政院科技部專題研究計畫。計畫名稱台式餐廳求解等待時間變異最小化之出菜排程問題 (MOST 105-2410-H-263-003-),執行期限: 2016/08/01~2017/07/31

• 李政雄,計畫主持人,行政院科技部專題研究計畫。計畫名稱聚乙烯工廠中總延遲最小化且具有專用機台限制之非等效平行機排程問題 (MOST 104-2410-H-263-002 -),執行期限: 2015/08/01~2016/07/31

• 李政雄,計畫主持人,行政院國科會專題研究計畫。計畫名稱聚氯乙烯膠皮工廠中總延遲時間最小化之排程問題 (NSC 103-2410-H-263-001-),執行期限: 2014/01/01~2014/12/31

產學合作案

• 李政雄,協同主持人,持續性稽核之各項應用可行性探索-第四期計畫,傑克商業自動化股份有限公司,2021/7/10~2022/7/31

• 李政雄,協同主持人,持續性稽核之各項應用可行性探索-第三期計畫,傑克商業自動化股份有限公司,2020/9/15~2021/9/30

• 李政雄,協同主持人,持續性稽核之各項應用可行性探索-第二期計畫,傑克商業自動化股份有限公司,2019/8/08~2020/7/31

• 李政雄,協同主持人,持續性稽核之各項應用可行性探索,傑克商業自動化股份有限公司,2018/6/01~2019/5/31

• 李政雄,協同主持人,以區間值模糊數應用於購置企業資源規劃系統之決策分析,益崧科技股份有限公司,2014/7/21~2015/2/28

• 李政雄,協同主持人,中小企業委外記帳與簽證之效益評估-以廣晉紡織為例,廣晉紡織有限公司,2014/1/29~2015/1/28

證照

• 企業電子化資料分析師合格證書。財團法人電腦技能基金會,20158月。

『基礎採購檢定 Accredited Purchasing Specialist, A.P.S.』,證書編號: 03719。社團法人中華採購與供應管理協會。201711月。

• 商業智慧規劃師。中華企業資源規劃學會,20199月。

瀏覽數: